Wisconsin Street (15th Street to Cody Road) Reconstruction Project

Timetable:

Engineering Agreement: May, 2023

Project: 2024

Project Description:

The City is in the early planning (Engineering Services Agreement) for the Wisconsin Street Reconstruction Project (15th Street to Cody Road).  Concepts are for resurfacing of Wisconsin Street (either asphalt or concrete) along with adding full concrete curb and gutter and storm sewer for the full length (from 15th Street to Cody Road).  Concepts also include a full 8' wide trail on the north side of Wisconsin Street along with a 5' wide sidewalk on the south side of Wisconsin Street.


Watch for additional planning with designs, possible costs, and bids and final timetables.

  1. 1